U.S. Bank Stadium

U.S. Bank Stadium is the largest public works project in MN history at 1.75 million square feet. The Metrodome was 900,000 square feet.) The seven-level superstructure consists of precast concrete seating units & cast-in-place concrete frames & concourses. The project incorporated 115,000 CY of ready mix concrete. The stadium was anchored by a ballast/column system comprised of mass concrete, supporting the steel truss “backbone” of the roof structure. Concrete was pumped up to 30 stories (via pump to pump) for some structural elements.
Project Team Members: | |
Owner: | MSFA |
Architect of Record: | HKS Sports & Entertainment Group |
Engineer of Record: | Thornton Tomasetti |
General Contractor: | Mortenson Construction w. Thor Construction |
Concrete Subcontractor: | Mortenson Construction w. Thor Construction |
Concrete Supplier: | Cemstone Products Company |
Location: | Minneapolis, MN |